June 15th, 1857
Commenced survey at sunrise, clear morning. Temperature 62°F.
North along the principal meridian between Sections 12 and 13:
Ch. 20.00 - Crossed small creek, 6 links wide, course E.
Ch. 40.00 - Set quarter section post, drove charred stake
- Bearing tree: Oak, 20" dia., N45°E, 42 links
- Soil: 1st rate, rolling prairie
- Scattered timber: Oak, Hickory
Ch. 65.50 - Intersected wagon trail to Fort Riley
Ch. 80.00 - Set post cor. of Sections 1, 12, 13 & 24
- Bearing tree: Elm, 15" dia., S20°W, 25 links
Weather turned inclement at 4 o'clock. Survey suspended.
Variations observed: 11°15' East
James W. Henderson
U.S. Deputy Surveyor
U.S. Deputy Surveyor