Workshop Exercises
Exercise 1: Data Import and Quality Check
Practice importing raw survey data and performing initial quality checks.
- Import the provided sample dataset RAW_SURVEY_001.csv
- Check for missing data points
- Validate coordinate systems
- Generate a quality report
Expected time: 30 minutes
Exercise 2: Total Station Setup
Learn proper total station setup and calibration procedures.
- Tripod setup and leveling
- Instrument centering
- Horizontal and vertical calibration
- Electronic distance measurement checks
Expected time: 45 minutes
Exercise 3: Control Point Network
Establish and measure a control point network.
- Control point placement strategy
- Network measurement techniques
- Redundancy checks
- Network adjustment
Expected time: 60 minutes
Exercise 4: Topographic Survey
Conduct a detailed topographic survey of the assigned area.
- Feature coding implementation
- Ground point collection
- Detail survey techniques
- Quality control measures
Expected time: 90 minutes
Exercise 5: GNSS Survey Methods
Practice various GNSS survey techniques and methodologies.
- RTK setup and initialization
- Static survey procedures
- Quality indicators monitoring
- Base station setup
Expected time: 60 minutes
Exercise 6: Boundary Survey
Perform a boundary survey including monument location and verification.
- Monument search techniques
- Boundary line measurements
- Corner perpetuation
- Legal description verification
Expected time: 120 minutes
Exercise 7: As-Built Survey
Complete an as-built survey of existing structures and utilities.
- Structure measurement techniques
- Utility location procedures
- Detail documentation
- Field sketching
Expected time: 75 minutes
Exercise 8: Construction Stakeout
Practice construction stakeout procedures and techniques.
- Point stakeout methods
- Line and offset staking
- Grade checking
- As-built verification
Expected time: 90 minutes
Exercise 9: Leveling Operations
Conduct precise leveling operations and vertical control establishment.
- Digital level setup
- Differential leveling
- Benchmark ties
- Error analysis
Expected time: 60 minutes
Exercise 10: Scanner Operation
Learn 3D laser scanner operation and data collection.
- Scanner setup procedures
- Scan registration techniques
- Target placement
- Quality control checks
Expected time: 90 minutes
Exercise 11: Volume Calculations
Perform field measurements for volume calculations.
- Stockpile surveys
- Cross-section measurements
- Surface modeling
- Volume computation methods
Expected time: 75 minutes
Exercise 12: Remote Sensing Integration
Combine traditional survey methods with remote sensing data.
- Drone data collection
- Ground control point establishment
- Data integration techniques
- Accuracy assessment
Expected time: 120 minutes
Exercise 13: Underground Utility Survey
Practice underground utility location and mapping techniques.
- Utility locator operation
- Depth measurement methods
- Marking procedures
- Documentation standards
Expected time: 90 minutes
Exercise 14: Deformation Monitoring
Set up and perform deformation monitoring measurements.
- Reference point establishment
- Monitoring point installation
- Precise measurement techniques
- Data analysis methods
Expected time: 120 minutes
Exercise 15: Field to Finish Workflow
Complete a comprehensive field to finish workflow exercise.
- Data collection planning
- Field measurement execution
- Data processing procedures
- Final deliverable preparation
Expected time: 180 minutes
Exercise Resources:
-
${data.handouts.map(handout => `
- ${handout.name} `).join('')}