Florida Subdivision Survey Project
6 hours
312 completed
Advanced
Learn how to conduct a comprehensive subdivision survey in Florida, following state-specific regulations and requirements for residential development projects.
Florida Requirements
- Compliance with Florida Administrative Code Chapter 5J-17
- Minimum lot size requirements per local zoning ordinances
- FEMA flood zone documentation
- Wetland delineation per Florida DEP standards
- Required setbacks from coastal construction control lines
Tools Required
- Total Station or RTK GPS equipment
- Data collector with Florida Coordinate System
- AutoCAD Civil 3D or equivalent software
- Florida Department of Transportation manuals
- Corner monumentation materials
Project Deliverables
- Certified boundary and topographic survey
- Subdivision plat meeting Florida recording requirements
- Legal descriptions for all new parcels
- Digital CAD files and point data
- Record of survey control points and benchmarks
Project Timeline
1 Research and Planning (1 hour)
- • Review Florida subdivision regulations and local zoning requirements
- • Obtain existing plats and property records
- • Research monuments and control points
2 Field Survey (2 hours)
- • Establish control network using Florida State Plane Coordinates
- • Locate existing monuments and property corners
- • Collect topographic data and identify site features
3 Data Processing (1.5 hours)
- • Process field data and perform closure calculations
- • Create digital terrain model
- • Draft preliminary lot layout
4 Final Documentation (1.5 hours)
- • Prepare final subdivision plat
- • Generate legal descriptions
- • Complete required Florida certifications